A 4×4 post set 36 in deep takes about 3.1 × 80-lb bags of Concrete Mix — buy 4 with 10% extra (or 6 × 50-lb Fast-Setting).
| Mix | Per post | Total | Est. cost |
|---|---|---|---|
| Fast-Setting 50 lb | 4.9 | 6 | $47.82 |
| Fast-Setting 60 lb | 4.1 | 5 | — |
| Concrete Mix 80 lb | 3.1 | 4 | $25.88 |
| Concrete Mix 60 lb | 4.1 | 5 | $24.25 |
Typical U.S. big-box prices checked October 2026. Tap any price to enter your store's.
| Post in ground | Hole depth | 50-lb Fast-Setting / post | 80-lb Concrete Mix / post |
|---|---|---|---|
| 24 in | 30 in | 3.6 | 2.2 |
| 30 in | 36 in | 4.2 | 2.7 |
| 36 in ← | 42 in | 4.9 | 3.1 |
| 42 in | 48 in | 5.6 | 3.5 |
| 48 in | 54 in | 6.3 | 3.9 |
The hole is a cylinder: π × (10.5 ÷ 2)² = 86.6 sq in. The post takes up 12.3 sq in, leaving 74.3 sq in of concrete for every inch of depth. Concrete runs 36 in around the post: 74.3 × 36 = 2,676 cu in, plus the 6 in dry-mix plug (86.6 × 6 = 520 cu in). 3,196 cu in ÷ 1,728 = 1.85 cu ft.
A 50-lb bag of Fast-Setting makes 0.375 cu ft and an 80-lb bag of Concrete Mix makes 0.6 cu ft, giving 4.93 and 3.08 bags per post.
Filled to the brim the way bag labels count, this hole takes the same 5 bags of Fast-Setting — here the label and the geometry agree.
The full method, material data and tips are on the main post hole concrete calculator page.