5 concrete steps 4 ft wide up to an existing porch take 21.4 cu ft (0.79 yd³) — 40 × 80-lb bags with 10% extra.
Volume = width × [rise × tread × (n−1)·n ÷ 2] with n = 5 step-ups: 4 ft × 770 sq in ÷ 144 = 21.39 ft³.
| Bag | Bags | Est. cost |
|---|---|---|
| 40 lb · 0.3 ft³ | 79 | — |
| 50 lb · 0.375 ft³ | 63 | — |
| 60 lb · 0.45 ft³ | 53 | $257 |
| 80 lb · 0.6 ft³ | 40 | $259 |
At these prices a truck becomes cheaper from about 3.25 yd³ (147 bags). Over 1–2 yd³, a truck also saves hours of mixing: plan on 3–4 minutes per bag in a mixer.
Typical U.S. big-box prices checked October 2026. Tap any price to enter your store's.
| Steps | Cubic yards | 80-lb bags | 60-lb bags | Bag cost | Ready-mix |
|---|---|---|---|---|---|
| 2 | 0.08 | 4 | 6 | $25.88 | $485 |
| 3 | 0.24 | 12 | 16 | $77.64 | $485 |
| 4 | 0.48 | 24 | 32 | $155 | $485 |
| 5 ← | 0.79 | 40 | 53 | $259 | $485 |
| 6 | 1.19 | 59 | 79 | $350 | $570 |
Treat each step as a solid block sitting on the ground: step 1 is one riser tall, step 2 two risers, and so on. Their side profiles add up to rise × tread × (n − 1)·n ÷ 2 = 7 × 11 × 20 ÷ 2 = 770 sq in.
Profile 770 sq in ÷ 144 = 5.347 sq ft × 4 ft wide = 21.39 cu ft. With 10% extra, 23.53 ÷ 0.6 = 39.2 → 40 bags.
At 0.87 yd³ bags are cheaper than a truck at the default prices, but plan the crew: 40 bags (3,200 lb) have to be mixed and placed in one session so the steps bond.
The full method, material data and tips are on the main concrete steps calculator page.