An 18 in Sonotube 4 ft long holds 7.07 cu ft of concrete — 12 × 80-lb bags or 16 × 60-lb bags.
| Per column | 60-lb | 80-lb |
|---|---|---|
| This calculator (geometry) | 16 | 12 |
| Bag | Bags | Est. cost |
|---|---|---|
| 40 lb · 0.3 ft³ | 26 | — |
| 50 lb · 0.375 ft³ | 21 | — |
| 60 lb · 0.45 ft³ | 18 | $87.30 |
| 80 lb · 0.6 ft³ | 13 | $84.11 |
Typical U.S. big-box prices checked 2026. Tap any price to enter your store's.
| Length | Cu ft per tube | 80-lb per tube | 60-lb per tube |
|---|---|---|---|
| 2 ft | 3.53 | 6 | 8 |
| 3 ft | 5.3 | 9 | 12 |
| 4 ft ← | 7.07 | 12 | 16 |
| 5 ft | 8.84 | 15 | 20 |
| 6 ft | 10.6 | 18 | 24 |
| 8 ft | 14.14 | 24 | 32 |
Round forms are cylinders: area = π × radius². An 18 in tube has a 9 in radius, so π × 9² = 254.5 sq in ÷ 144 = 1.767 sq ft. Multiply by the length in feet for cubic feet.
7.07 cu ft ÷ 0.6 cu ft per 80-lb bag = 11.78, and ÷ 0.45 per 60-lb bag = 15.71. Tube tables round each tube up.
At 0.29 yd³ this is a bag job: a truck's 1 yd minimum plus fees would cost about $485.
The full method, material data and tips are on the main sonotube & column concrete calculator page.