A 6 in Sonotube 4 ft long holds 0.79 cu ft of concrete — 2 × 80-lb bags or 2 × 60-lb bags.
| Per column | 60-lb | 80-lb |
|---|---|---|
| This calculator (geometry) | 2 | 2 |
| Quik-Tube data sheet | 2 | 2 |
| Bag | Bags | Est. cost |
|---|---|---|
| 40 lb · 0.3 ft³ | 3 | — |
| 50 lb · 0.375 ft³ | 3 | — |
| 60 lb · 0.45 ft³ | 2 | $9.70 |
| 80 lb · 0.6 ft³ | 2 | $12.94 |
Typical U.S. big-box prices checked 2026. Tap any price to enter your store's.
| Length | Cu ft per tube | 80-lb per tube | 60-lb per tube |
|---|---|---|---|
| 2 ft | 0.39 | 1 | 1 |
| 3 ft | 0.59 | 1 | 2 |
| 4 ft ← | 0.79 | 2 | 2 |
| 5 ft | 0.98 | 2 | 3 |
| 6 ft | 1.18 | 2 | 3 |
| 8 ft | 1.57 | 3 | 4 |
Round forms are cylinders: area = π × radius². A 6 in tube has a 3 in radius, so π × 3² = 28.3 sq in ÷ 144 = 0.196 sq ft. Multiply by the length in feet for cubic feet.
0.79 cu ft ÷ 0.6 cu ft per 80-lb bag = 1.31, and ÷ 0.45 per 60-lb bag = 1.75. Tube tables round each tube up — here that leaves most of a bag over, so on several tubes round the total instead.
At 0.03 yd³ this is a bag job: a truck's 1 yd minimum plus fees would cost about $485.
The full method, material data and tips are on the main sonotube & column concrete calculator page.