88 ft of 12 × 8 in footing takes 2.17 cubic yards of concrete — 108 × 80-lb bags with 10% extra, or 2.5 yd³ of ready-mix.
| Bag | Bags | Est. cost |
|---|---|---|
| 40 lb · 0.3 ft³ | 216 | — |
| 50 lb · 0.375 ft³ | 173 | — |
| 60 lb · 0.45 ft³ | 144 | $698 |
| 80 lb · 0.6 ft³ | 108 | $640 |
At these prices a truck becomes cheaper from about 3.25 yd³ (147 bags). Over 1–2 yd³, a truck also saves hours of mixing: plan on 3–4 minutes per bag in a mixer.
Typical U.S. prices checked October 2026. Tap any price to enter your store's.
| Size | Cubic yards | 80-lb bags | 60-lb bags | Bag cost | Ready-mix |
|---|---|---|---|---|---|
| 12 × 6 in | 1.63 | 81 | 108 | $480 | $655 |
| 12 × 8 in | 2.17 | 108 | 144 | $640 | $740 |
| 16 × 8 in | 2.9 | 144 | 192 | $854 | $868 |
| 20 × 10 in | 4.53 | 225 | 299 | $1,334 | $1,045 |
| 24 × 12 in | 6.52 | 323 | 431 | $1,915 | $1,428 |
12 in × 8 in = 96 sq in of cross-section, ÷ 144 = 0.667 cu ft per foot. Times 88 ft = 58.67 cu ft, ÷ 27 = 2.173 yd³.
With 10% extra that is 64.53 cu ft ÷ 0.6 cu ft per 80-lb bag = 107.6, rounded up to 108 bags.
At about $170 per yard plus delivery, fuel and a short-load fee under 4 yd³, a truck beats bags from roughly 3.25 yd³. This job is 2.39 yd³ with waste, so bags make sense — if you have the crew to mix them.
The full method, material data and tips are on the main concrete footing calculator page.